Franklin Academy formerly St. Paul’s Academy
Blythe was selected as the design-build mechanical contractor for this 47,000 square foot secondary school. Pre-construction services included thorough coordination of structural and electrical requirements for mechanical work in order to minimize total project cost and to maximize space utilization. Work installed includes complete plumbing and HVAC systems for classrooms, offices, athletic areas, and laboratory areas. The HVAC system features hydronic heat pumps with heat recovery systems. Laboratory spaces required acid resistant waste piping, compressed air piping, and fume hoods.
Location:
Bellingham, WA
General Contractor:
Strengholt Construction Company, Inc.